SCOPING BREAKDOWN SUMMARY TIME DEPTH GRAPH DOIS REPORTING

SN TARGET SAND
#
Hole Sections
STOVE PIPE
Pre-Driven
Shallow Gas Pilot Holes

HOLE SECTIONS End Depth(ft AH) Inc. (Deg) Shallow Gas Pilot Holes Line/Casting/Plug Back Casing Materials Mud Type Cement (+ %Excess) Slurry Type
Hole Sections For Plug Back
Hole Section Start Depth Start Inc. End Depth End Inc. Mud Type Plug Back Plug Back Depth No Of Plugs
Hole Sections
(Pilot)
Drilling Services
Hole Sections DD/MWD GWD MUD LOGGING MPD FEWD
(Pilot)
Special Drilling Tools/Services & Charges
Hole Section Material Description Days Amount ($)
Hole Sections Hole Type Logging Type Logging Service
Hole Section No Of Cores Start Core Depth Total Footage
(Pilot)
Upper Completions
Lower Completions
Cased Hole
Zone Top Depth Interval To Complete Sand Control Size Smart Completions Perforating Length
SN Material Description Amount (USD)
#

Just A Few Seconds